
Trench 2 at clitterhouse farm. Don pointing to a feature and Bill providing the leg work. Taken 20 minutes before an iron pipe showed up running across the trench.
Trench 2 at clitterhouse farm. Don pointing to a feature and Bill providing the leg work. Taken 20 minutes before an iron pipe showed up running across the trench.